Brown Middle School, Newton, MA

  • Total Cost: $2,557,822
  • General Contractor: Lockheed Window Corp.
  • Project Type: Window Replacement

This was a single-trade construction project that included 100% removal/replacement of the single pane metal windows with new aluminum thermal-frame operable windows that had low E insulated glazing. The caulking and glazing of the existing windows contained asbestos and abatement was required as the work proceeded. The project commenced in September and had to be done while the school was fully occupied. The construction period spanned through to the following summer using second shift operations only and there were no issues throughout the entire project and there was no need to relocate any classes during the entire project.