Peirce Elementary School, Newton, MA

  • Total Cost: $441,100
  • General Contractor: GVW, Inc.
  • Project Type: Window Replacement

The windows and doors were replaced during one summer recess period. The caulking and glazing contained asbestos so the windows were removed by a separate abatement subcontractor under controlled abatement procedures. The single-paned, non-thermal metal windows were replaced with thermal aluminum windows. Glazing studies were performed and the new glazing included various Low E glazing types as well as increased quantities of translucent insulated panels to enhance the thermal performance of the window walls.

Site by Clockwork Design Group, Inc.